Capital Project Update
August 2007

Capital Project renovations take shape this summer
Students, faculty and staff returning to Duanesburg Middle/High School in September can expect to see some significant changes around campus.

Work began in earnest this summer to start and complete a $1.398 million capital project, approved by voters in October 2006, to fund renovations and improvements to the secondary campus.

Upgrading the technology room
A complete redesign of the technology room within its current footprint is progressing and is expected to be ready for students by the start of the school year allowing them complete access to this more effective learning space that houses a technology lab, sound proof TV/radio stations and multipurpose media technology room.
The room was completely disassembled to reorganize the space. Walls were freshly painted and a new ventilation system was installed. Cabinetry is expected to be delivered in early September with installation to begin around the beginning of school.
 
Star facilities for star athletes
Last school year was the greatest yet for athletic achievements in Duanesburg’s history. Now the district will have first-rate facilities for its top-notch athletes and students. The boys and girls locker rooms are being completely renovated to enhance their functionality and appearance. Plumbing has been updated so athletes, students and visiting teams will have access to improved showers.

Art Annex
The art annex was connected to the municipal water and sewer system. The new, handicap accessible bathroom and sink are being installed as well as new walls and new flooring.

Improving student safety
Nine new digital security cameras were installed this summer bringing the total to 16 cameras strategically placed inside and outside of buildings throughout the district. The new digital system, enhances security and replaces the older analog system. A new digital video recorder system was also installed at the elementary school.
Site-work was completed in the lower parking lot in preparation for paving. Students should be able to park on the newly paved lot starting this fall.
Heating controls and lighting improvements are underway to regulate classroom temperatures and conserve energy.

> Back

 

Photos
Public Vote
Public Hearing
Questions and Answers
This page is maintained by Audrey Hendricks, communications specialist, according to the Web publishing guidelines of Duanesburg Central Schools, 133 School Drive, Duanesburg, NY 12053. Copyright © 2004. All rights reserved. Produced and maintained in cooperation with the Capital Region BOCES Communications Service.